Preservation and Maintenance Treatments Resource Guide

37 Typical Timeframe Average Cost (per Sq Yard) Reason for Application Every 1-2 years $ To prevent water infiltration and further cracking. Every 3-5 years $$ To seal extensive cracking and alligatored areas. Every 5-7 years $$ Mass crack seal, rejuvenate the surface, add a new wearing surface and increase skid resistance. Every 3-5 years $ To rejuvenate oxidized asphalt and seal the surface, reducing small raveling. Every 3-5 years $$ To rejuvenate oxidized asphalt and seal small surface cracks. Every 5-7 years $$-$$$ To protect against oxidative damage seal surface. Every 3-5 years $$ To protect against oxidative damage seal surface. Every 5-7 years $$$$ Mass crack seal, rejuvenate the surface, add a new wearing surface and increase skid resistance. Every 5-7 years $$$$ To provide a new wearing surface, seal roadway and increase skid resistance. Every 5-7 years $$$ To provide a new wearing surface, seal minor cracks and increase skid resistance. Every 5-7 years $$$$ To provide a new wearing surface, seal roadway, rut filling and improve skid resistance. Every 7-10 years $$$$$ Mass crack seal, rejuvenate the surface, add a new wearing surface, rut filling and increase skid resistance. Every 10-15 years To rehabilitate and reuse existing pavement materials. Every 10-15 years To rehabilitate and reuse existing pavement materials. Every 7-10 years To provide a new wearing surface and improve ride quality. Every 10-15 years To provide a new wearing surface and increase structural capacity. Every 10-15 years To provide a durable wearing surface and improve ride quality.

RkJQdWJsaXNoZXIy ODQxMjUw