Pub 3 2020-2021 Issue 1
21 SMALL PROJECT OF THE YEAR NOMINEE GRANITE CONSTRUCTION — WANSHIP TO PEOA The project consists of rotomilling 3-inches of existing asphalt and replacing with 3-inches of new, fine graded HMA. Structure work (E1210, C-288, and F-457); remov- ing existing asphalt, structural pothole patching and repaving paving back. Installing drainage structures and water quality control structure inWanship. Soft spot repairs, reconstruction of pedestrian ramps, replacing and, when necessary, relocating signs, reestablishing all pavement markings and pavement messages. 3 Reach your customers with print. To advertise in this magazine, contact us today. 801.676.9722 | 855.747.4003 thenewslinkgroup.org sales@thenewslinkgroup.com
Made with FlippingBook
RkJQdWJsaXNoZXIy ODQxMjUw