Pub 3 2020-2021 Issue 1
26 LARGE PROJECT OF THE YEAR NOMINEE GRANITE CONSTRUCTION — SR-65 (MP 8.43-21.77) AND SR-66 (MP .00- 8.74) LARGE PROJECT OF THE YEAR NOMINEE GRANITE CONSTRUCTION — SR-190: BIG COTTONWOOD CANYON TO BRIGHTON SKI RESORT This project improved SR-65 and 66 with a new HMA surface and final chip seal surface on a major recreation corridor for the surrounding area. Tasks included roto- milling 1.5 inches of existing asphalt and replacing it with 1.5 inches of fine graded, HMA on SR-65 and SR-66, HMA tie-ins to East Canyon Resort and East Canyon State Park, repairing all soft spots within the project limits as deter- mined by the engineer, reestablishing shouldering three feet wide along entire project length, reestablishing all pavement markings and pavement messages within the project limits, removing and installing 25,089 LF of existing W-Beam Guardrail with a new 31-inch W Beam Guardrail and casting in place a concrete barrier wall. 3 This project consisted of milling and paving 3 inches of 0.5 inch fine grade HMA 32,173 TN, reconstructing utilities, 34 EA (Rapid Set Mix), and installing concrete pavement for the waterway and bus pad at Brighton Loop. French drains were installed to dispel subgrade waterflow and 17.4 miles of UTB shouldering were built. This project was unique with its extensive Public Involvement (PI) efforts to engage the very active residents, as well as the recreators that utilize Big Cottonwood Canyon on a daily basis. 3
Made with FlippingBook
RkJQdWJsaXNoZXIy ODQxMjUw