Pub. 6 2024 Issue 3

Price Municipal Airport The construction performed under Schedules I through III of this project was funded by UDOT Aeronautics Division at 90% participation with the local share at 10% and included the following work: • Runway 1-19 and Taxiway A Pavement Maintenance • Runway 15-22 Pavement Maintenance • Apron Pavement Maintenance Construction Bid: $309,678 Roosevelt Municipal Airport 2024 Airfield Pavement Preservation Project 45-23-009/002 1 Work Items Constructed: The project consisted of design, bidding and construction phases for crack sealing, seal coating and re-marking of various airfield pavement areas within the property boundaries at the Roosevelt Municipal Airport, located just west of Roosevelt, Utah. Design kicked off in February 2024 and was presented to Roosevelt City Corporation in March 2024 for review and approval. Base Bid Schedule work included, crack repair, pavement marking removal, application of an emulsified asphalt seal coat (satisfying FAA’s P-608 Specification) and re-application of pavement markings on approximately 114,500 SY of airport pavements including Runway 7/25, parallel Taxiway A and associated connectors and Apron. Because the base bid included application of P-608 seal coat to the runway, a runway friction test was required and completed. Construction Bid: $267,670 33

RkJQdWJsaXNoZXIy MTg3NDExNQ==