Pub. 8 2020 Directory

25 is anchored by the learning stair, offering additional alternative teaching opportunities. The learning stair is built from the glulam beams, which supported the roof of the original gymnasium. A balcony at the top of the learning stair overlooks the Multipurpose space and leads to the Library. Third, fourth and fifth-grade classrooms are located on the upper level along the main corridor. Floor to roof glazing at light wells separating each wing flood the corridor with daylight and a sense of connectivity between the floors. Design Team DOWLING Architects Michael W. Dowling Scott Deitle Michael Frudakis ALSC Architects Ken Murphy Troy Bishop Kamela Potratz Structural, Mechanical, Electrical, Civil Engineering Morrison, Maierle, Inc. b

RkJQdWJsaXNoZXIy OTM0Njg2